What "Verified" means
A megawatt on a listing is worth something only if someone has checked it. This page says what we check, and what each label does and does not promise.
Four levels, one for every block of power
A site rarely has one number. It may have 5 MW today and 20 MW more after an upgrade. We label each block separately.
EnergizedExisting service delivers this capacity today.
CommittedAn executed service or interconnection agreement covers it, with a defined capacity and schedule.
ConditionalThe utility has confirmed it, subject to named upgrades, studies or approvals.
Seller-reportedThe owner's own figure. We have not confirmed it yet, and it never counts as verified capacity.
How a site earns the badge
- The owner signs a letter authorizing us to ask the utility about the property.
- We send the request to the serving utility.
- The utility replies in writing.
- We store that reply as the evidence file.
- A named person at DeployMW approves the badge, block by block. The date is shown on the listing.
What Verified does not mean
- It is not a commitment or a reservation of capacity by the utility or by DeployMW.
- It is true as of the date shown. Capacity can change after that date.
- A Conditional block depends on the conditions the utility named. Those are released with the site brief after you sign our non-disclosure agreement.